No. I put everything as impassable initially. Then I put on a passable floor on layer 1. Next I flood passable tiles over layer 2 that isn't covered. Then I set up the passable tile on layer three and add the details after that. If necessary I modifiy layer 2 and 3 for additional passability/impassability.